Well what an eventful 2 weeks it has been.
We had a storm at the beginning of this year and had a lot of damage done to the buildings here. I believe I already wrote this before but I will do it again.
With the type of construction here (brick) there are different methods for construction needed than in other parts of the word (where construction is done with steel / wood and so on).
One of the methods practiced here is, after constructing a wall, at the top of the wall put a protective layer of cement on top (called a cement coping). This protects the top of the wall.
Now in most circumstances this practice does not make sense, since eventually the top of the wall will be covered with a roof and the roof will protect it.
Unless......
You have a giant storm which rips off the roof exposing the wall to the weather.
And in the case of this building there was no cement coping installed on the top of the wall.
So what happened was that after the roof was ripped off the rains (4-6 hours each day) deposited so much water on top of the wall that the water infiltrated down between the mortar joints in the wall.
This led to the structure of the wall becoming weak.
So starting last week we began with demolition on the duplex.
This week we have begun to re-construct it, with a few changes. Which has been quite a task onto itself.
Things in the villages this week have been a bit disruptive as a higher amount of people have been dying. So we have not seen much of some chiefs because they have been away at funerals.
Our church which we go to is St. Cecelia Catholic Church. It is located not to far away from our compound. We had a meeting last week and agreed that we needed to clean up the church. So yesterday morning Araceli, Timeyo and I woke up around 5:30 and headed out to the church at 6. We had a plan to clear everything out.
The plan was for everyone to show up at 8 but we wanted to get an early start to avoid the sun.
As we started working we cleared most of the brick and weeds out of the inside of the church.
We then began to break the bricks up on the inside to make a suitable floor. Tis is until we can raise the money to but a proper floor in.
Two things happened which we did not plan for:
1) Rain decided to come on Saturday so we did not see any sun but instead got a nice bit of rain.
2) There was a funeral on Saturday so nobody else showed up.
It is quite a bad thing, culturally, if people do not show up to funerals. So whether you know the deceased or not you are required to go. This is not true for everybody but most everybody.
We finished up around 8 and then headed back for some breakfast. The rest of the day we spent relaxing.
We are looking forward to start our next week of work but also because our anniversary is coming up and we are planning on heading out somewhere, not sure where yet though.
I have been writing this blog on and off today as we have been outside working to expand our garden. Timeyo did good when we were gone and planted some plants but we have been working to plant more.
We found some cactus the other day while clearing some brush to we decided to add them. Along with that some flowers which we brought from back home, although we will have to wait until those grow.
We had a storm at the beginning of this year and had a lot of damage done to the buildings here. I believe I already wrote this before but I will do it again.
The new growth from our herb garden.
One of the methods practiced here is, after constructing a wall, at the top of the wall put a protective layer of cement on top (called a cement coping). This protects the top of the wall.
Now in most circumstances this practice does not make sense, since eventually the top of the wall will be covered with a roof and the roof will protect it.
Unless......
You have a giant storm which rips off the roof exposing the wall to the weather.
And in the case of this building there was no cement coping installed on the top of the wall.
So what happened was that after the roof was ripped off the rains (4-6 hours each day) deposited so much water on top of the wall that the water infiltrated down between the mortar joints in the wall.
This led to the structure of the wall becoming weak.
Re-building the duplex
This week we have begun to re-construct it, with a few changes. Which has been quite a task onto itself.
Things in the villages this week have been a bit disruptive as a higher amount of people have been dying. So we have not seen much of some chiefs because they have been away at funerals.
Our church which we go to is St. Cecelia Catholic Church. It is located not to far away from our compound. We had a meeting last week and agreed that we needed to clean up the church. So yesterday morning Araceli, Timeyo and I woke up around 5:30 and headed out to the church at 6. We had a plan to clear everything out.
The plan was for everyone to show up at 8 but we wanted to get an early start to avoid the sun.
As we started working we cleared most of the brick and weeds out of the inside of the church.
The crew working away
Two things happened which we did not plan for:
The temporary floor finished up
2) There was a funeral on Saturday so nobody else showed up.
It is quite a bad thing, culturally, if people do not show up to funerals. So whether you know the deceased or not you are required to go. This is not true for everybody but most everybody.
The crew relaxing after (Man, Man, Timeyo, Araceli)
We finished up around 8 and then headed back for some breakfast. The rest of the day we spent relaxing.
We are looking forward to start our next week of work but also because our anniversary is coming up and we are planning on heading out somewhere, not sure where yet though.
I have been writing this blog on and off today as we have been outside working to expand our garden. Timeyo did good when we were gone and planted some plants but we have been working to plant more.
The extension of the garden. Cactus on the front left